top of page
Industrial.png

HDPE PIPE FUSION & INSTALLATION

This is What We Do, and We are Good at It.  Our operators are certified through a rigorous training program to ensure we have the most qualified personnel. They receive constant updates on new equipment and procedures, which allows us to produce consistent “Industry Standard results”. Excellence and Safety is our standard.

HOW WE DO IT

Lemoine Industrial has earned a reputation as the go-to contractor to our clients for underground and above ground HDPE installations.  We apply decades of HDPE background into every project we install: whether its a new piping system or repairing / replacing an existing line, Lemoine’s strong knowledge of HDPE fusion techniques, equipment and training has provided our customers UNMATCHED solutions for their HDPE projects.

MACHINE TROUBLESHOOTING & REPAIR SERVICES

Our fusion technicians are also qualified to machine troubleshoot and repair equipment to keep your job on schedule and on budget.

PipeFusion Installation and Repair: 2 inch to 48 inch and larger

Dewatering / Bypass Systems

Pipe Systems: (Firewater, Industrial Wastewater & Process Water lines)

Emergency Response / FloodWater Piping

OUR SERVICES

We have completed work for Industrial Plants, Landfills, Municipal Water and Sewer projects and more:  Our operators are fully trained and certified to operate all thermal fusion equipment (butt, socket, sidewall & electro-fusion), mobile transfer and cutting equipment.

Custom weld procedures

Fusion logging/tracking

Independent third party testing

EMERGENCY RESPONSE SERVICES

225.687.2640

FEATURED PROJECTS

DOW CHEMICAL / PLAQUEMINE, LA

1100 lf of 18 in, SDR-11 / Data Logger / New PIV & Hydrants (Steel Risers with Gate Valves & Fire Truck Connections)

SHINTECH / PLAQUEMINE, LA

Maintenance of existing Fire Water System: Repair / Replace Hydrants, PIV’s and Monitors / Main line repairs at multiple locations throughout Plant (Replaced PVC with HDPE)

IMTT / GEISMAR, LA

Replaced outdated steel with 24in HDPE throughout Plant

CITY OF BATON ROUGE

Fuse / Install 3 separate 24in sewer by-pass lines (2,300 lft)

STATE OF LOUISIANA / MULTIPLE SITES

Emergency Flood Response (Install flood water by-pass systems: Pumps & HDPE Inlet / Discharge large diameter piping)